Welcome to the KIDE Community Events Calendar!

To submit an event to the calendar, please click here!

To submit a PSA to our calendar, please click here to fill out the form.

Loading Events

« All Events

  • This event has passed.

Lewiston Dam Spring release

April 20, 2022

The Trinity River Restoration Program has released water flow from Lewiston Dam. and should reach the maximum release of about 6,000 cubic feet per second today. The River flows are always change – Please take appropriate safety precautions whenever using the river!
The flows will be reduced and maintained at around 2,000 cfs until the 450 cfs summer baseflow period begins on Tuesday, May 17th.

Details

Date:
April 20, 2022
Event Category:
Event Tags:
, ,

The Trinity River Restoration Program has released water flow from Lewiston Dam. and should reach the maximum release of about 6,000 cubic feet per second today. The River flows are always change – Please take appropriate safety precautions whenever using the river!
The flows will be reduced and maintained at around 2,000 cfs until the 450 cfs summer baseflow period begins on Tuesday, May 17th.

Details

Date:
April 20, 2022
Event Category:
Event Tags:
, ,